Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

groundloop

(13,994 posts)
Tue Jun 23, 2026, 06:56 PM 3 hrs ago

Trump says DC reflecting pool repairs may not be done in time for 4 July

Source: The Guardian

Donald Trump has acknowledged that repairs to the algae-stricken reflecting pool in Washington DC may not be completed in time for the Fourth of July, when the president plans to convene a big celebration on the National Mall to ring in the country’s 250th birthday.

The iconic body of water began filling with algae blooms and peeling paint after the Trump administration ordered a $14.2m renovation to turn it “American flag” blue, prompting the president to claim – without providing evidence – that vandals armed with a knife had damaged it.

He reiterated the allegation in a social media post on Tuesday, while indicating the repair work may not be completed in time for the country’s semiquincentennial.

“We will drain some of the water, either immediately before or after the Fourth of July, to do the permanent repair,” Trump said.

Read more: https://www.theguardian.com/us-news/2026/jun/23/trump-dc-reflecting-pool-repair-july-fourth

7 replies = new reply since forum marked as read
Highlight: NoneDon't highlight anything 5 newestHighlight 5 most recent replies
Trump says DC reflecting pool repairs may not be done in time for 4 July (Original Post) groundloop 3 hrs ago OP
Where is DOGE when you could use it? Raven123 3 hrs ago #1
And right NOW.........Fencing going up around Reflecting Pool............ riversedge 2 hrs ago #2
They did a shoddy rush-job because he had to have it for HIS birthday, and so RockRaven 2 hrs ago #3
Is okay dweller 2 hrs ago #4
I could give a shit. greatauntoftriplets 2 hrs ago #5
Idiot says: "We will drain some of the water, either immediately before or after the Fourth of July, to do the permanent dave99 2 hrs ago #6
Who got this contract? How? If he changes the color, it admits fault. Norrrm 57 min ago #7

RockRaven

(20,040 posts)
3. They did a shoddy rush-job because he had to have it for HIS birthday, and so
Tue Jun 23, 2026, 07:04 PM
2 hrs ago

America gets a wrecked hole in the ground for ITS birthday.

Fitting.

dave99

(521 posts)
6. Idiot says: "We will drain some of the water, either immediately before or after the Fourth of July, to do the permanent
Tue Jun 23, 2026, 07:29 PM
2 hrs ago

repair," Trump said.

The shitstain DOES NOT KNOW you need to DRY the COMPLETE surface.

Should be exposed to AIR for at least 4 weeks before start of work. Keeping Dried Areas covered in traps to avoid resaturation from rain water.

A REAL repair should take 18 to 24 weeks to allow curing time (drying for the MAGAs) before a drop of FILTERED water is put back into the area.

BUT these contractor will not do so and we'll be back to this point again..